Sorry, this item is temporarily out of stock.

(2m, Black) SAMSUNG Charger Cable USB C Type C Long Lead Heavy Duty Braided 1m 2m 3m Fast Charging

By TIERERO
New
£3.14
Add to Basket
Description & Details

Summary

  • Built to Last: Premium density double-braided nylon exterior with tinned copper wires inside and laser-welded putted on connectors for maximum reliability and durability. Up to 10,000+ bend and 6,000+ plugging and unplugging lifespan, which is proved a superior toughness than original device cables.
  • Super Tough Armor Zinc-Alloy Connectors
  • Tangle-Free, Robust Cable Design for Extra Durability
  • Made with durable TPE Material and pure oxygen-free copper wire core
  • Constant current and voltage for consistent charge times

(2m, Black) SAMSUNG Charger Cable USB C Type C Long Lead Heavy Duty Braided 1m 2m 3m Fast Charging Description

Environmental-friendly material, and special processing with a 4,000 times bending test, this strong cord is made of high-quality copper core and highly protective jacket for greater reliability and longer service life.

Universal Compatibility - Fully supports, Data Syncing and Battery Charging.

Premium Quality design fits all aftermarket cases & accessories.

Light-weight - Superior Durability

Available in 1 Metre - 2 Metre - 3 Metre

Available in Black - Blue - Rose Gold - Silver - Gold - Red

Details

OPC P6RQKRW
Brand
TIERERO
Codes 5056500011492 (EAN)
Links Mobile Phones & Accessories

Detailed Product Information

Weight30g
ColourBlack
Length2m

Cable / Adaptor Details

Connector 1Type C USB
Cable Length2m
Connector 2USB

Product & Price History

Here on our marketplace, we feature a vast selection of different TIERERO products to intrigue you. Online shoppers can locate this electronic gizmo boasting a popularity rank of 2873 inside the Mobile Phone Charging Cables catalogue.

Tech shoppers can discover Samsung charger cable usb c type c long lead displayed in the Mobile Phone Charging Cables section.

Our community of electronics specialists first listed this tech product on this marketplace on 07 February 2021. Since then its cost has fluctuated 33 times. Check out the price chart for more information. Prior to this electronic gizmo running out of stock, the previous price tag was £3.14. At OnBuy, we’ve collected the best tech gadgets from our Mobile Phone Chargers category, as our tech vendors stock 19035 different Mobile Phone Charging Cables, with the highest rated items being Bose SoundLink Wireless Speaker USB Charging Cable Power Charger Lead Adapter and Apple Lightning to USB Cable (2m) | MD819ZM/A.

Price Graph

Price history - lowest £3.14 (07/08/2022)

Product price history A line chart showing the price history for (2m, Black) SAMSUNG Charger Cable USB C Type C Long Lead Heavy Duty Braided 1m 2m 3m Fast Charging. £3.21 - 28/05/2022 £3.49 - 29/05/2022 £3.49 - 05/06/2022 £3.49 - 12/06/2022 £3.49 - 19/06/2022 £3.49 - 26/06/2022 £3.49 - 03/07/2022 £3.49 - 10/07/2022 £3.49 - 17/07/2022 £3.49 - 24/07/2022 £3.14 - 07/08/2022 28/05/2022 07/06/2022 17/06/2022 27/06/2022 07/07/2022 17/07/2022 27/07/2022 06/08/2022 £4.52 £4.27 £4.02 £3.77 £3.52 £3.27 £3.02
Browse All Mobile Phone Charging Cables

Highest Rated in Mobile Phone Charging Cables

Popular products recommended for you

Product Reviews of (2m, Black) SAMSUNG Charger Cable USB C Type C Long Lead Heavy Duty Braided 1m 2m 3m Fast Charging

All OnBuy Reviews are Verified

Overall Rating:
5 Star
2 Reviews
4 Star
0 Reviews
3 Star
0 Reviews
2 Star
0 Reviews
1 Star
0 Reviews
Highest Rated Review
5/5
K. hudson
Posted 15/07/2021
3m charging cable
Brilliant product as stated, ordered for second time and not a problem with either of the products, more than happy with them.
Filter Reviews
 5/5
K. hudson
Posted 15/07/2021
Length 3m
Colour Gold

3m charging cable

Brilliant product as stated, ordered for second time and not a problem with either of the products, more than happy with them.
 5/5
S. Brown
Posted 13/06/2021
Length 2m
Colour Rose Gold

Cable

Very good for what I needed as I needed longer cable

Sorry, this item is temporarily out of stock.

(2m, Black) SAMSUNG Charger Cable USB C Type C Long Lead Heavy Duty Braided 1m 2m 3m Fast Charging

New
£3.14
Delivery Address

Sign in to view all of your delivery addresses

OR

Enter your delivery address

Wait! You have something in your basket!

Did you know we can save your basket and send it to you?
Simply enter your email address below.

No thanks, I'd rather miss out

This page has expired.

Please refresh the page to continue shopping.

Refresh and continue