Share

USB Charging Charger Cable 3M Long Lead for Nintendo Switch UK Black

By Ameego
Condition New
£3.99
£8.99
Save 56%
Fast Free Delivery
Add To Basket
Checkout secured by PayPal
  • We verify all of our sellers
  • Secure checkout powered by PayPal
  • All major credit cards accepted
  • 30-day returns as standard OnBuy's minimum returns period is 30 days for most products. There are however some exceptions e.g. perishable goods, personalised items etc. Please read our T&Cs for more information.
Delivery to: Mainland UK
Standard Delivery FREE Est. Delivery 29th Sep - 1st Oct
Priority Delivery £11.00 Est. Delivery 26th Sep
In Stock
Sold By My Ameego
Add To Basket
Description & Details

Summary

  • Extra Long to charge and play at same time
  • Strong and sturdy cable
  • Fast reliable connection
  • Reversible Type C connector
  • Ameego - The Brand That You Can Trust

USB Charging Charger Cable 3M Long Lead for Nintendo Switch UK Black Description

3 Meter Long Type C USB-3.1 Fast Charge & Sync Lead Cable For NINTENDO SWITCH

Extra Long Cable simultaneously play & charge at the same time

Syncing & Charging with USB ensures fast and stable data transfers and charging

Plug in the right way every time PREMIUM Reversible Type C Cable ensures you can plug
and unplug easily without checking side position.

Strong sturdy cable resistant to pull and wear, USB 3.1 Built to last and reliable,

Support Data Syncing and Battery Charging, fast reliable connection ensures data
is transferred quickly and safely.

Details

OPC P57H9WJ
Brand
Ameego
Codes 5055546000859 (EAN)
Rank #12 Nintendo Switch Accessories
#50 Nintendo
#218 Video Games & Consoles

Detailed Product Information

Manufacturer Recommended Age12
MaterialPlastic
ColourBlack
Width4mm
Length3m
Height4mm
Weight41g

Compare Sellers

  • New from £3.99
Delivery To: Mainland UK
Seller Ratings Warranty Returns Price Delivery Total Quantity
(43 reviews)
12 months
30 Days
Free Returns: No
£3.99 Fast Free Delivery
Est. Delivery: 29th Sep - 1st Oct
£3.99
Add To Basket

Product Reviews of USB Charging Charger Cable 3M Long Lead for Nintendo Switch UK Black

All OnBuy Reviews Are Verified

Overall Rating:
5 Star
1 Reviews
4 Star
0 Reviews
3 Star
0 Reviews
2 Star
0 Reviews
1 Star
0 Reviews
Highest Rated Review
5/5
c. williams
Posted 12/05/2020
Sold By: My Ameego
Nintendo switch charger
It arrived after no longer than a week and was in great condition. The charger works brilliantly and the long wire means I can move my switch somewhere safe (not the floor haha) while it charges.
Filter Reviews
 5/5
c. williams
Posted 12/05/2020
Sold By My Ameego

Nintendo switch charger

It arrived after no longer than a week and was in great condition. The charger works brilliantly and the long wire means I can move my switch somewhere safe (not the floor haha) while it charges.

Sign in to view all of your delivery addresses

OR

Enter your delivery address

Save your items for later!

Simply enter your email address below and we'll send you a copy of your basket to your inbox.

No thanks