DIY Electronic Kit Electronic Windmill Flowing Water Light 43 LED 5V Fun Soldering Component Practice Kit

Ny

På lager

Derfor vil du elske at handle hos OnBuy:

  • Tjen Cashback på hvert køb – brug det med det samme på din næste ordre
  • Gratis levering – på millioner af varer på siden
  • Kunder elsker os – 136,000 anmeldelser med vurderingen “Fremragende”

Se fuld produktbeskrivelse og detaljer

264,69 kr.
281,34 kr. Spar 6%!
+40,22 kr. levering
1% Tjen 2,65 kr. med det samme Læs mere
Læg i kurv

Priserne for varer, der sælges af OnBuy, inkluderer moms.

Rentefrie betalingsmuligheder

Se fuld produktbeskrivelse og detaljer

Levering: Standard (40,22 kr.) | man. 2. - lør. 7. nov.

Solgt af: Hoeappt

Returnering: 30 dage

180 dages betalingsbeskyttelse

Læg i kurv
Beskrivelse og detaljer

Oversigt

  • After being powered on, 43 LEDs dynamically display various patterns, and 9 animation playback switches are achieved through the screen switching switch S3, including forward windmill, reverse windmill, rotating petal, rotating pendulum, rotating sheep horn, petal blooming, snowflake formation, concentric diffusion, and rotating ellipse.
  • Press S1 to slow down and S2 to accelerate.
  • The products which are suitable for electronic enthusiasts to study and repair circuits. The installation of the circuit requires the buyer to have experience in the circuit.
  • Note: This is DIY kit, not a finished product. You will need to solder it yourself.
  • All light-emitting diodes and microcontrollers have polarity components. Be careful not to install them upside down. If other colors are needed, simply replace the LEDs (note: all LEDs on the circuit board are installed in the up positive and down negative directions).

DIY Electronic Kit Electronic Windmill Flowing Water Light 43 LED 5V Fun Soldering Component Practice Kit Beskrivelse

After being powered , 43 LEDs dynamically display various patterns, and 9 animation playback switches are achieved through the screen switching S3, including forward windmill, reverse windmill, rotating petal, rotating pendulum, rotating sheep horn, petal blooming, snowflake formation, concentric diffusion, and rotating ellipse.
Press S1 to slow down and S2 to accelerate.
The products which are suitable for electronic enthusiasts to study and repair circuits. The installation of the circuit requires the buyer to have experience in the circuit.
Note: This is DIY kit, not a finished product. You will need to solder it yourself.
All light-emitting diodes and microcontrollers have polarity components. Be careful not to install them upside down. If other colors are needed, simply replace the LEDs (note: all LEDs the circuit board are installed in the positive and down negative directions).

Introduction to Circuit Principles
43 LEDs are connected to a dedicated microcontroller DX158 through a combination of rows and columns, and are scanned and driven to light as needed through the microcontroller program. The microcontroller program of this kit has been burned and can produce results after welding.
DC1 is small socket, It can be powered by 4-5V , and can be powered by any 5V charging . ( 5V charging Not included).
C1 is a filtering capacitor, which is generally not installed for stable power supply, and the kit is not provided, which does not affect the usage effect.
Color: Green
Material: PCB

Package Contents:
1* DIY kit
1* Power cable

Detaljer

OPC PYH5WBS
Koder 6032526490113 (EAN)
Produkt- og sikkerhedsoplysninger

Produktbilleder

DIY Electronic Kit Electronic Windmill Flowing Water Light 43 LED 5V Fun Soldering Component Practice Kit 1
DIY Electronic Kit Electronic Windmill Flowing Water Light 43 LED 5V Fun Soldering Component Practice Kit 2
DIY Electronic Kit Electronic Windmill Flowing Water Light 43 LED 5V Fun Soldering Component Practice Kit

Produktdata

Height1cm
Width8cm
Length10cm
Weight0.0435kg
ColourGreen
MaterialPCB

Sammenlign sælgere for DIY Electronic Kit Electronic Windmill Flowing Water Light 43 LED 5V Fun Soldering Component Practice Kit

  • Ny fra 304,91 kr.
Sælger Bedømmelser Garanti Returneringer Pris Levering I alt Antal
Afsendt fra: China
(183 anmeldelser)
-
30 dage
Gratis retur Nej
264,69 kr.
+40,22 kr. Delivery
Forventet levering: 2-7 nov.
304,91 kr.
Læg i kurv

Tjen penge, mens du handler med øjeblikkelig Cashback på alt.

Ingen hage, ingen omkostninger

  • Indbetalt til din OnBuy-konto
  • Brug dem på dit næste køb
  • Gem det eller hæv det

Bliv Cashback VIP

Bare 1 køb giver adgang til bedre tilbud og priser

Ressourcer om sikkerhed og produkt

Sikkerhedsbilleder og -dokumenter

Denne information er desværre ikke tilgængelig i øjeblikket. Vi arbejder sammen med sælgeren på at opdatere denne sektion hurtigst muligt, så kom gerne tilbage senere.

Oplysninger om producenten

Denne information er desværre ikke tilgængelig i øjeblikket. Vi arbejder sammen med sælgeren på at opdatere denne sektion hurtigst muligt, så kom gerne tilbage senere.

Ansvarlig person i EU

Denne information er desværre ikke tilgængelig i øjeblikket. Vi arbejder sammen med sælgeren på at opdatere denne sektion hurtigst muligt, så kom gerne tilbage senere.

Vent! Du har glemt
noget...

Du får kun øjeblikkelig Cashback hos OnBuy! Indtast din e-mail nedenfor, så sender vi dig en kopi af din kurv, så du sparer tid senere.

Når du indtaster din e-mailadresse, bliver du automatisk tilføjet til vores database, hvor du kan få personlige Cashback-tilbud og tidlig adgang til vores bedste tilbud. Du kan til enhver tid afmelde vores e-mails, og vi deler aldrig dine oplysninger med andre. Læs mere i vores privatlivspolitik og vilkår og betingelser.

Inden du går videre...
Husk, du får kun øjeblikkelig Cashback på alt hos OnBuy!

Vil du have adgang til personlige tilbud og de højeste Cashback satser? Tilmeld dig vores nyhedsbrev nedenfor.

Du kan til enhver tid afmelde vores e-mails, og vi deler aldrig dine oplysninger med andre. Læs vores privatlivspolitik og vilkår og betingelser for at få mere at vide.

Denne side er udløbet.

Opdater venligst siden for at fortsætte med at handle.

Opdater og fortsæt