Product Images
In stock
Smart shoppers OnBuy it!
Interest-free payment options available
See full product description & details
Delivery: Standard (Free) | Fri 28th Aug - Thu 3rd Sep
Sold by: BearLad
Returns: 30 days
180-day payment protection
Summary
Mouse Pad 11.8 x 9.8 inch / 30cm x 25cm Square Computer Mouse Pads Design, Washable Mat Gaming Office Home Non-Slip Rubber Base Mousepad
BearLad creates a variety of colorful mouse pads that will hopefully add a bit of vibrancy and art to your workspace.Love novel and unique designs and light up your wrokspace with BearLad mouse pad.
Specifications
- Material: High-quality rubber
- Brand: BearLad
- Bottom material: Natural rubber
- Pad size: 11.8 x 9.8 x 0.12 inches / 30 x 25 x 0.3 cm
- Back of color: Black
- Pattern: unique colorful colors
Suitable Floral Mouse Pad- Perfect size: 11.8"x 9.8"(300mm x 250mm), 3mm thickened design to adapt to all surfaces, which is always the best office suppiles. This cute mouse pad is very safe, without unpleasant smell.
Superb Quality& Stitched Edges- The flower mouse pad is made of premium lycra cloth, full color printing and vibrant permanent color, no discoloration or fading. It feels soft against the skin, allowing the mouse to slide easily. This gaming mouse pad has delicate edges which can prevent wear.
Non-slip Natural Rubber Base & Waterproof- Non-slip, environmental protection, soft comfortable and no deformation rubber base will firmly grips the desktop to eliminate unwanted movement. Effectively prevent accidental damage from spilled liquid or other accidents. When liquid splashes on the computer pad, it will form into water drops and slide down.
Ultra-smooth Surface & Easy to Clean- This high-quality kawaii unique mousepad is optimized for fast movement while maintaining excellent speed and control during your work or game, available for mechanical, wireless and optical mice. And it is easy to keep clean and will not delay your work or game.
Novelty shape- Any pattern of mouse pads for wireless mouse are carefully handpicked to ensure its superb look, and this watercolor flower gaming mouse mat will add more color to your working or gaming environment and be a nice desk decor at home or in the office. You will be impressed by our mouse pads for desk!
Details
| OPC | PC8WMDR |
|---|---|
| Brand | BearLad |
| Codes | 7802738122275 (EAN) |
| Rank | #100 Mouse Pads & Wrist Rests |
| #562 Keyboards, Mice & Input Devices |
Product Data
| Material | Rubber polyester |
|---|---|
| Size | 11.8 x 9.8 x 0.12 inches (300mm x 250mm x 3mm). |
| Product Performance | Non-slip and wear-resistant, comfortable to touch. |
| Applicable Scenarios | Office, gaming, studying, etc. |
| Seller | Ratings | Warranty | Returns | Price | Delivery | Total | Quantity |
|---|---|---|---|---|---|---|---|
|
Dispatched from:
|
(73 reviews) | - |
30 Days
Free Returns No
|
£13.99
|
+Free Delivery
Est. Delivery:
28th Aug - 3rd Sep
|
£13.99
|
Earn as you shop with instant Cashback on everything.
No catch, no cost
Become a Cashback VIP
Just 1 purchase unlocks bigger deals & rates
You'll only get instant Cashback at OnBuy! Enter your email below and we'll send you a copy of your basket to save you time later.
By entering your email address, you'll automatically be added to our database, where you can enjoy personalised Cashback offers and early access to our best deals. You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.
Want access to personalised offers and the highest Cashback rates? Sign up to our emails below.
You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.
This page has expired.
Refresh and continue