Product Images
In stock
Smart shoppers OnBuy it!
Interest-free payment options available
See full product description & details
Delivery: Standard (Free) | Fri 18th - Mon 21st Sep
Sold by: My Ameego
Returns: 30 days
180-day payment protection
Summary
3 Meter Long Type C USB-3.1 Fast Charge & Sync Lead Cable For NINTENDO SWITCH
Extra Long Cable simultaneously play & charge at the same time
Syncing & Charging with USB ensures fast and stable data transfers and charging
Plug in the right way every time PREMIUM Reversible Type C Cable ensures you can plug
and unplug easily without checking side position.
Strong sturdy cable resistant to pull and wear, USB 3.1 Built to last and reliable,
Support Data Syncing and Battery Charging, fast reliable connection ensures data
is transferred quickly and safely.
Details
| OPC | P57H9WJ |
|---|---|
| Brand | Ameego |
| Codes | 5055546000859 (EAN) |
Detailed Product Information
| Colour | Black |
|---|---|
| Material | Plastic |
| Manufacturer Recommended Age | 12 |
| Weight | 41g |
| Height | 4mm |
| Length | 3m |
| Width | 4mm |
| Colour | Black |
| Material | Plastic |
| Manufacturer Recommended Age | 12 |
| Weight | 41g |
| Height | 4mm |
| Length | 3m |
| Width | 4mm |
| Seller | Ratings | Warranty | Returns | Price | Delivery | Total | Quantity |
|---|---|---|---|---|---|---|---|
| (163 reviews) | 12 months |
30 Days
Free Returns No
|
£3.99
|
+Fast & Free Delivery
Est. Delivery:
18th-21st Sep
|
£3.99
|
All OnBuy Reviews are Verified Reviews
Earn as you shop with instant Cashback on everything.
No catch, no cost
Become a Cashback VIP
Just 1 purchase unlocks bigger deals & rates
You'll only get instant Cashback at OnBuy! Enter your email below and we'll send you a copy of your basket to save you time later.
By entering your email address, you'll automatically be added to our database, where you can enjoy personalised Cashback offers and early access to our best deals. You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.
Want access to personalised offers and the highest Cashback rates? Sign up to our emails below.
You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.
This page has expired.
Refresh and continue