12m Power Cable For Flymo Hover Stripe RXE300 Lawnmower Extra Long Lead Plug
In stock
Smart shoppers OnBuy it!
- Earn Cashback on every purchase – spend it instantly on your next order
- Free delivery – on millions of items across the site
- Customers love us – 139,000 Trustpilot reviews and an 'Excellent' rating
Interest-free payment options available
See full product description & details
Delivery: Standard (Free) | Thu 19th - Fri 20th Nov
Sold by: SPARES2GO
Returns: 60 days
180-day payment protection
You might also like
12m Power Cable For Flymo Hover Stripe RXE300 Lawnmower Extra Long Lead Plug Description
12 Metre Power Cable For Flymo Hover Stripe RXE300 Lawnmower
Brand new high-quality compatible replacement mains cable & plug for your Flymo garden appliances.
Specification: 12 metres, 2 core, 1.00mm flex, BS1363/A Certified
Please Note: This Item Is ONLY For Use With FLYMO Electric Outdoor Products which require a hard wire 2 core cable.
Fits models:
FLYMO
Flymo Hover Stripe RXE300 Lawnmower
**Please note: this cable is designed for mowers with hard-wired cables. Please check that your mower has a cable that matches the specification above. This product is not manufactured by Flymo, but it is designed to be compatible with Flymo machines. The Flymo name, model names and any part numbers have been used for reference purposes only and are in no way associated with the original manufacturer.
Details
| OPC | P6KHYYN |
|---|---|
| Brand | |
| Codes | 5057817645738 (EAN) |
Customers also buy
Compare Sellers for 12m Power Cable For Flymo Hover Stripe RXE300 Lawnmower Extra Long Lead Plug
- New from £18.39
| Seller | Ratings | Warranty | Returns | Price | Delivery | Total | Quantity |
|---|---|---|---|---|---|---|---|
| (732 reviews) | - |
60 Days
Free Returns No
|
£18.39
|
+Fast & Free Delivery
Est. Delivery:
19th-20th Nov
|
£18.39
|
Earn as you shop with instant Cashback on everything.
No catch, no cost
- Paid into your OnBuy account
- Spend it on your next purchase
- Save it or withdraw it
Become a Cashback VIP
Just 1 purchase unlocks bigger deals & rates
























