12m Power Cable For Flymo Turbo Lite 330 Lawnmower Extra Long Lead with Plug

New

In stock

Smart shoppers OnBuy it!

  • Earn Cashback on every purchase – spend it instantly on your next order
  • Free delivery – on millions of items across the site
  • Customers love us – 139,000 Trustpilot reviews and an 'Excellent' rating

See full product description & details

£18.39
FREE Delivery
1% What is instant Cashback? Learn More
Add to Basket

Interest-free payment options available

See full product description & details

Delivery: Standard (Free) | Thu 19th - Fri 20th Nov

Sold by: SPARES2GO

Returns: 60 days

180-day payment protection

Add to Basket
Description & Details

12m Power Cable For Flymo Turbo Lite 330 Lawnmower Extra Long Lead with Plug Description

12 Metre Power Cable For Flymo Turbo Lite 330 Lawnmower

Brand new high-quality compatible replacement mains cable & plug for your Flymo garden appliances.

Specification: 12 metres, 2 core, 1.00mm flex, BS1363/A Certified

Please Note: This Item Is ONLY For Use With FLYMO Electric Outdoor Products which require a hard wire 2 core cable.

Fits models:

FLYMO

Flymo Turbo Lite 330 Lawnmower

**Please note: this cable is designed for mowers with hard-wired cables. Please check that your mower has a cable that matches the specification above. This product is not manufactured by Flymo, but it is designed to be compatible with Flymo machines. The Flymo name, model names and any part numbers have been used for reference purposes only and are in no way associated with the original manufacturer.

Details

OPC P6KHYYQ
Brand
Codes 5057817645769 (EAN)

Compare Sellers for 12m Power Cable For Flymo Turbo Lite 330 Lawnmower Extra Long Lead with Plug

  • New from £18.39
Seller Ratings Warranty Returns Price Delivery Total Quantity
(732 reviews)
-
60 Days
Free Returns No
£18.39
+Fast & Free Delivery
Est. Delivery: 19th-20th Nov
£18.39
Add To Basket

Earn as you shop with instant Cashback on everything.

No catch, no cost

  • Paid into your OnBuy account
  • Spend it on your next purchase
  • Save it or withdraw it

Become a Cashback VIP

Just 1 purchase unlocks bigger deals & rates

Wait! You've left
something behind

You'll only get instant Cashback at OnBuy! Enter your email below and we'll send you a copy of your basket to save you time later.

By entering your email address, you'll automatically be added to our database, where you can enjoy personalised Cashback offers and early access to our best deals. You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.

Before you go...
Remember, you'll only get instant Cashback on everything at OnBuy!

Want access to personalised offers and the highest Cashback rates? Sign up to our emails below.

You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.

This page has expired.

Please refresh the page to continue shopping.

Refresh and continue