(Black, 3 Metre) Charging Cable for PlayStation 4 Controller, Xbox One, PS4 Fast Charging Long Lead USB

Brand Ameego
New

In stock

Smart shoppers OnBuy it!

  • Earn Cashback on every purchase – spend it instantly on your next order
  • Free delivery – on millions of items across the site
  • Customers love us – 140,000 Trustpilot reviews and an 'Excellent' rating

See full product description & details

£4.29
FREE Delivery
1% What is instant Cashback? Learn More
Add to Basket

Flexible payment options available

See full product description & details

Delivery: Standard (Free) | Fri 4th - Mon 7th Dec

Sold by: My Ameego

Returns: 30 days

180-day payment protection

Add to Basket
Description & Details

Summary

  • Fast Charging
  • High Quality Nylon Braided Cable
  • User friendly connector
  • Great with your smartphone as well
  • Charge and Play

(Black, 3 Metre) Charging Cable for PlayStation 4 Controller, Xbox One, PS4 Fast Charging Long Lead USB Description

PlayStation 4 Controller Charging Cable Xbox One PS4 Fast Charging Long Lead USB

The Charge & Play  Controller Charge Cable allows the gamer to simultaneously charge

and play the PS4 or Xbox One wireless controller.

With a long length, this allows comfortable gameplay. No more waiting for your controller

to charge!


Features

- Fully compatible with PlayStation 4 (PS4) and Xbox One Controllers for charging and

gameplay.
- High quality USB A to Micro USB B cable is expertly designed and offers a smooth and

tight connection to the controller.

- User-friendly Connector design helps you insert the cable the correct way, all the time.


- Fast charging.


- Works great on smartphones as well.


- Simultaneously charge and play with the wireless Xbox One or PlayStation 4 (PS4)

controller.

Features

  • PEGI Rating: 7+
  • Genre: Simulation

Details

OPC P5KNRKZ
Brand
Ameego
Codes 5055928211187 (EAN)
Rank In demand

Product Images

(Black, 3 Metre) Charging Cable for PlayStation 4 Controller, Xbox One, PS4 Fast Charging Long Lead USB 1
(Black, 3 Metre) Charging Cable for PlayStation 4 Controller, Xbox One, PS4 Fast Charging Long Lead USB 2
(Black, 3 Metre) Charging Cable for PlayStation 4 Controller, Xbox One, PS4 Fast Charging Long Lead USB

Detailed Product Information

Width0.5mm
Length3
Height0.25mm
MaterialNylon
Manufacturer Recommended Age7+
Weight60g
Width0.5mm
Length3
Height0.25mm
MaterialNylon
Manufacturer Recommended Age7+
Weight60g
Width0.5mm
Length3
Height0.25mm
MaterialNylon
Manufacturer Recommended Age7+
Weight60g

Compare Sellers for (Black, 3 Metre) Charging Cable for PlayStation 4 Controller, Xbox One, PS4 Fast Charging Long Lead USB

  • New from £4.29
Seller Ratings Warranty Returns Price Delivery Total Quantity
(169 reviews)
-
30 Days
Free Returns No
£4.29
+Fast & Free Delivery
Est. Delivery: 4th-7th Dec
£4.29
Add To Basket

Reviews of (Black, 3 Metre) Charging Cable for PlayStation 4 Controller, Xbox One, PS4 Fast Charging Long Lead USB

All OnBuy Reviews are Verified Reviews

Overall Rating:
5
6 Reviews
4
1 Reviews
3
0 Reviews
2
0 Reviews
1
0 Reviews
Highest Rated Review
5/5
A. Jackson
Posted 25/01/2024
Sold By My Ameego
This was bought as a backup for my PS4 chargies the controllers well and can also be used to charge other stuff very happy thankyou.
Filter Reviews
5/5
A. Jackson
Reviewed from GB
Posted 25/01/2024
Product Black, 2 Metre
Sold By My Ameego
This was bought as a backup for my PS4 chargies the controllers well and can also be used to charge other stuff very happy thankyou.
5/5
C. Fashina
Reviewed from GB
Posted 17/06/2021
Product Black, 1 Metre
Sold By My Ameego
I’m happy with this product and lasted very long in comparison with other cables I have purchased from other companies in the past.
5/5
G. Wright
Reviewed from GB
Posted 25/05/2020
Product Black, 2 Metre
Sold By My Ameego
Bought one for my sons Xbox works perfectly and is very flexible also comes with a Velcro tie to keep it neat definitely recommended and very quick delivery

Earn as you shop with instant Cashback on everything.

No catch, no cost

  • Paid into your OnBuy account
  • Spend it on your next purchase
  • Save it or withdraw it

Become a Cashback VIP

Just 1 purchase unlocks bigger deals & rates

Wait! You've left
something behind

You'll only get instant Cashback at OnBuy! Enter your email below and we'll send you a copy of your basket to save you time later.

By entering your email address, you'll automatically be added to our database, where you can enjoy personalised Cashback offers and early access to our best deals. You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.

Before you go...
Remember, you'll only get instant Cashback on everything at OnBuy!

Want access to personalised offers and the highest Cashback rates? Sign up to our emails below.

You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.

This page has expired.

Please refresh the page to continue shopping.

Refresh and continue