Product Images
In stock
Smart shoppers OnBuy it!
Flexible payment options available
See full product description & details
Delivery: Standard (Free) | Fri 4th - Mon 7th Dec
Sold by: My Ameego
Returns: 30 days
180-day payment protection
Summary
PlayStation 4 Controller Charging Cable Xbox One PS4 Fast Charging Long Lead USB
The Charge & Play Controller Charge Cable allows the gamer to simultaneously charge
and play the PS4 or Xbox One wireless controller.
With a long length, this allows comfortable gameplay. No more waiting for your controller
to charge!
Features
- Fully compatible with PlayStation 4 (PS4) and Xbox One Controllers for charging and
gameplay.
- High quality USB A to Micro USB B cable is expertly designed and offers a smooth and
tight connection to the controller.
- User-friendly Connector design helps you insert the cable the correct way, all the time.
- Fast charging.
- Works great on smartphones as well.
- Simultaneously charge and play with the wireless Xbox One or PlayStation 4 (PS4)
controller.
Features
Details
| OPC | P5KNRMF |
|---|---|
| Brand | Ameego |
| Codes | 5055928211071 (EAN) |
Detailed Product Information
| Material | Nylon |
|---|---|
| Manufacturer Recommended Age | 7+ |
| Weight | 24g |
| Height | 0.25mm |
| Length | 1 |
| Width | 0.5mm |
| Material | Nylon |
| Manufacturer Recommended Age | 7+ |
| Weight | 24g |
| Height | 0.25mm |
| Length | 1 |
| Width | 0.5mm |
| Seller | Ratings | Warranty | Returns | Price | Delivery | Total | Quantity |
|---|---|---|---|---|---|---|---|
| (169 reviews) | - |
30 Days
Free Returns No
|
£3.49
|
+Fast & Free Delivery
Est. Delivery:
4th-7th Dec
|
£3.49
|
All OnBuy Reviews are Verified Reviews
Earn as you shop with instant Cashback on everything.
No catch, no cost
Become a Cashback VIP
Just 1 purchase unlocks bigger deals & rates
You'll only get instant Cashback at OnBuy! Enter your email below and we'll send you a copy of your basket to save you time later.
By entering your email address, you'll automatically be added to our database, where you can enjoy personalised Cashback offers and early access to our best deals. You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.
Want access to personalised offers and the highest Cashback rates? Sign up to our emails below.
You can opt out of our emails at any time and we'll never share your details with anyone. Check our Privacy Policy and T&Cs to find out more.
This page has expired.
Refresh and continue